Define Phase:
In our biopharmaceutical company we have a grade A
isolator within a grade C room. While aseptically manufacturing sterile
vaccines, it has previously occurred that a sensor has failed within the sterile
isolator. If this faulty sensor were to be simply removed and replaced with a
new one this would then expose an unsterile surface where the original sensor
was fixed to the isolator. (Isolator sterility occurs using vaporized hydrogen
peroxide) We therefore have to stop the batch, empty and clean the isolator,
implement batch recovery then start a new batch. This results in downtime of
approx. 30 hrs. along with waste of consumables and the cost of a Quality
Notification (QN).
In 2016 our company has progressed from that of a
startup company to a sustainable production facility. This year we will be
producing 3.6 times more doses as we did in 2015. It was therefore requested by
the Assoc. Dir. Operations that a team be put together to use the DMAIC model
to target the higher causes of downtime which occurred in the previous year(s).
The team was
selected in Q4 2015 and included Maintenance, Automation, Operations and
Reliability Excellence personnel. In the Define phase I met with Operations and
Quality leads and also with the Site Leadership Team to conduct a VOC. The
detail of the VOC will be shown in the project report.
One of the main
challenges I encountered in the Define phase was to obtain the input from the
various departments of their views for the VOC. The site has become increasingly
busy and people are being stretched from one project to another. The allocation
of time allowed by the team to focus on the project is another concern. I will
be meeting with the various team member managers to discuss this and also give
updates over the duration of our project.
Above shows our
SIPOC high level process flow for a batch recovery. This was a great eye opener for the team as we
saw the problem as a whole and the effects it had on each customer area / dept.
The Project
Charter was also completed during the Define phase. Background information on
the schedule for 2016 and information on the parts of the Isolator were also
gathered.